1/5
Skid-Mounted Biogas Scrubber Pre-Treatment Desulfurization De-Sulphur System Equipments图1Skid-Mounted Biogas Scrubber Pre-Treatment Desulfurization De-Sulphur System Equipments图2

Skid-Mounted Biogas Scrubber Pre-Treatment Desulfurization De-Sulphur System Equipments

$2.00 / Piece
FOB Price:
Negotiable | Get Latest Price
Order Quantity:
1 Set / Sets
Supply Ability:
1000 Set / Sets per Month
Port:
shanghai
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other
Delivery Detail:
5 days
Hot in store
Product Details
Product Name: Skid-Mounted Biogas Scrubber Pre-Treatment Desulfurization De-Sulphur System Equipments Model NO.: ALONG BIOGAS -GasCle Biogas Flow: 20~300 Nm3/H Controlling: VFD with LCD Display/Touch Screen Function: Moisture&Dust&H2s Removal, Pressure Regulation Biogas Application: for Biogas Generator, Torch or Boiler Warranty: One Year Pressure: Constant Pressure Feed to Generator Tank Material: Stainless Steel 304 or Carbon Steel Blower: Anti-Explosion, Variable Frequency Motor Connection Pipes: PVC or Stainless Steel Pipes Auxiliary: Pressure Guage, H2s Sensor, Ss Flange,etc Trademark: ALONG BIOGAS Transport Package: LCL or FCL Specification: Complete System Origin: China HS Code: 8486909000 Product Description Material option: Cast iron, Stainless steel 304Our GasClesystem is for the pre-treatment of raw biogas from anaerobic reactor, suitable for biogas flow 20 ~ 500 Nm³/hr. The raw biogas from digester always contains saturated water vapor, physical impurities and hydrogen sulfide. These substances should be removed before the utilization of biogas, to avoid damage to generator, burner of boiler and torch or other equipment.The GasClesystem is skid mountedin combination of multiple functional units, or individually installed at project site.GasCle system has thefollowing modules:1. Primaryfilter (optional)For preliminary removalof physicalimpurities and saturated water vapor;2. Desulphurization tank.For reducingthe hydrogen sulfide content in biogas, to meet the requirements of follow-up equipment;3. Secondaryfilter.For Preciseremoval of physicalimpuritiesin the biogas and moisture;4. BiogasblowerIncreasing biogas pressure for transportation and meed the requirement of follow-up equipment for gas intake pressure;5. Electrical control system Equipped with VFD(variable frequency drive) and LCD touch screen.- Pressure gauge and H2S analyzer(Optional).- Pipes, valves and base frame.GasCle system has the following functions:1. DesulfurizationHydrogen sulfide can be reduced to 50ppm or less;2. DehydrationRemoval ofsaturated water vapor;3. Impurity removal.Removal of physical impuritiesand volatile matter of desulphurizer agent;4. Pressure increasingIncrement could reach39.8kPaor even higher;5. Pressure stabilization Stabilizinggasoutlet pressureat a fixed valueto meet the gas intake pressure requirement of the follow-up equipment;6. Measurement of Pressure and hydrogen sulfide content (optional);7. Digital display.Pressure setpoint,gas outlet pressure, motor frequency, motor speed, motor current, output torque, bus voltage, output voltage, power consumption and system operation time would be indicated on the LCD display.
Contact with Supplier

Inquiry title*

main content*

company

Name*

Telephone*

Email*

QQ

Ali Wangwang

30 inquiries available today
At present, times have been inquired
You can also inquire times
Recommend product