1/5
C1022A Cold Heading Quality Saip Annealed Phosphate Coated Cold Drawn Drywall Screw Fasteners Steel 图1C1022A Cold Heading Quality Saip Annealed Phosphate Coated Cold Drawn Drywall Screw Fasteners Steel 图2

C1022A Cold Heading Quality Saip Annealed Phosphate Coated Cold Drawn Drywall Screw Fasteners Steel

$740.00 / Tons
FOB Price:
Negotiable | Get Latest Price
Order Quantity:
1 Set / Sets
Supply Ability:
1000 Set / Sets per Month
Port:
shanghai
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other
Delivery Detail:
5 days
Hot in store
Product Details
Product Name: C1022A Cold Heading Quality Saip Annealed Phosphate Coated Cold Drawn Drywall Screw Fasteners Steel Wire Model NO.: C1022A Status: Hard State metal Wire Drawing: Cold Drawing Surface Treatment: Black Phosphate Coated Type: Steel Coil Application: Fasteners Cross Sectional Shape: Round Material: Steel Wire Usage: for Making Screws Diameter: 2.6-24.0mm Coil Weight: 100-2000kg Per Coil Grade of Steel: C1022 Inner Diameter of Wire Coil: 600mm, 800mm, 1100mm, 1500mm Delivery Time: Among 20 Days for a 20gp Container Trademark: AOTIAN WIRE Transport Package: Sea-Worthy Package Specification: 2.6-24.0mm Origin: Wuxi, Jiangsu, China HS Code: 72171000 Product Description Product Information:Name: C1022Chemical Composition(%)CSiMnPSAlTiBCrMoNiCu0.18~0.23≤0.100.70~1.00≤0.030≤0.035≥0.02<0.05<0.0005<0.30<0.05<0.30<0.10More Attributes:Surface TreatmentBlack Phosphate CoatedUsageFor making screwsDiameter2.6-24.0mmCoil Weight100-2000kg Per CoilGrade of SteelC1022Inner Diameter of Wire Coil600mm,800mm,1100mm,1500mmPackageSea-worthy packageDelivery TimeAmong 20 days for one 20GP containerTechnical Process(wire drawing):FAQ:Q1. Are you factory ?A1: Yes, our company is located in WuxiChina, welcome to visit us.Q2. What is your main products?A2: All kinds of Cold Head Quality drawn wire for fastener manufacture and all kinds of standard and non-standard screws.Q3. How long is your delivery time?A3: For products in stock, we can ship it within 7days after receive payment.For custom order, within 24 tons, wire production time is around 15 days after prepayment received;screw production time is 30-40 days after prepayment received.Q4. What is your payment term?A4: 100% through T/T. 30% value of T/T in advance and rest 70% balance before shipment or according to B/L copy.For small order less than 1000USD, would suggest you pay 100% in advance to reduce bank charges.Q5.Can you provide asample?A5: Sure, Our sample is provided free of charge, but not including courier fees.Contact us:Sales Manager: LinWeb: http://en.aotianwire.com/ http://en.wxzhongrui.cn/
Contact with Supplier

Inquiry title*

main content*

company

Name*

Telephone*

Email*

QQ

Ali Wangwang

Recommend product